Final Trim Launch Specialist
Posted on Sep 21, 2024 by Segula Technologies
Warren, MI
Other
Immediate Start
Annual Salary
Full-Time
Job Description
Engineering and optimizing the stations of their scope and ensuring their readiness along the project milestones for a General Assembly workshop.
Working with the other “metrics” to ensure each station meets all requirements (ergonomics, safety, process, etc.…) to be fully operational and bought off.
Pulling key stakeholders together on a regular basis to plan and design workstations.
Addressing quickly any issue and tracking their resolution through available quality tools (Checklists, Kaizen Journals, open issue lists, etc.).
Ensuring the operator footprint and interface with the Performance Feedback System
Conducting SLPR audits
Updating the CAD to match the expected layout.
Conducting field checks / vendor layout reviews, etc.
Tracking inaccuracies
Change Management: managing and documenting changes related to scroll update after scroll freeze
Being a proactive member of the launch process and opening issues against other groups for topics that are detrimental to Station Readiness, then tracking those issues until closure.
Engineering and optimizing the stations of their scope and ensuring their readiness along the project milestones for a General Assembly workshop.
Working with the other “metrics” to ensure each station meets all requirements (ergonomics, safety, process, etc.…) to be fully operational and bought off.
Pulling key stakeholders together on a regular basis to plan and design workstations.
Addressing quickly any issue and tracking their resolution through available quality tools (Checklists, Kaizen Journals, open issue lists, etc.).
Ensuring the operator footprint and interface with the Performance Feedback System
Conducting SLPR audits
Updating the CAD to match the expected layout.
Conducting field checks / vendor layout reviews, etc.
Tracking inaccuracies
Change Management: managing and documenting changes related to scroll update after scroll freeze
Being a proactive member of the launch process and opening issues against other groups for topics that are detrimental to Station Readiness, then tracking those issues until closure.
Reference: 202107918
https://jobs.careeraddict.com/post/95492928
Final Trim Launch Specialist
Posted on Sep 21, 2024 by Segula Technologies
Warren, MI
Other
Immediate Start
Annual Salary
Full-Time
Job Description
Engineering and optimizing the stations of their scope and ensuring their readiness along the project milestones for a General Assembly workshop.
Working with the other “metrics” to ensure each station meets all requirements (ergonomics, safety, process, etc.…) to be fully operational and bought off.
Pulling key stakeholders together on a regular basis to plan and design workstations.
Addressing quickly any issue and tracking their resolution through available quality tools (Checklists, Kaizen Journals, open issue lists, etc.).
Ensuring the operator footprint and interface with the Performance Feedback System
Conducting SLPR audits
Updating the CAD to match the expected layout.
Conducting field checks / vendor layout reviews, etc.
Tracking inaccuracies
Change Management: managing and documenting changes related to scroll update after scroll freeze
Being a proactive member of the launch process and opening issues against other groups for topics that are detrimental to Station Readiness, then tracking those issues until closure.
Engineering and optimizing the stations of their scope and ensuring their readiness along the project milestones for a General Assembly workshop.
Working with the other “metrics” to ensure each station meets all requirements (ergonomics, safety, process, etc.…) to be fully operational and bought off.
Pulling key stakeholders together on a regular basis to plan and design workstations.
Addressing quickly any issue and tracking their resolution through available quality tools (Checklists, Kaizen Journals, open issue lists, etc.).
Ensuring the operator footprint and interface with the Performance Feedback System
Conducting SLPR audits
Updating the CAD to match the expected layout.
Conducting field checks / vendor layout reviews, etc.
Tracking inaccuracies
Change Management: managing and documenting changes related to scroll update after scroll freeze
Being a proactive member of the launch process and opening issues against other groups for topics that are detrimental to Station Readiness, then tracking those issues until closure.
Reference: 202107918
Share this job:
Alert me to jobs like this:
Amplify your job search:
Expert career advice
Increase interview chances with our downloads and specialist services.
Visit Blog